Skip to Content

Blog Archives

10283 Ilderton Road, Coldstream, Ontario

Written on July 24, 2020 at 7:17 pm, by

AGM was retained by Valleyview Developments to develop a Plan of Subdivision in Coldstream. The proposed Subdivision is located on the south side of Ilderton Road, between Quaker Lane and Coldstream Road. The draft plan has 13 estate lots and 2 open space blocks. As part of the draft plan submission AGM also prepared a  Continue Reading »

10379 Ilderton Road, Coldstream, Ontario

Written on July 24, 2020 at 7:16 pm, by

AGM was retained by Valleyview Developments to develop a Plan of Subdivision in Coldstream. The proposed Subdivision is located on the south side of Ilderton Road west of Coldstream Road. The draft plan has 13 estate lots and 6 open space blocks. As part of the draft plan submission AGM also prepared a Functional Servicing  Continue Reading »

Renwick Estates Subdivision – Komoka

Written on July 24, 2020 at 7:14 pm, by

AGM was retained by Brantam Developments to develop a Plan of Subdivision in Komoka. The proposed Renwick Estates Subdivision is located west of Komoka Road and north of Oxbow Drive. The draft plan has 166 single family residential lots and 5 medium density blocks. As part of the draft plan submission AGM also prepared a  Continue Reading »

Poplar Woods Estates Subdivision -Ilderton, Ontario

Written on July 24, 2020 at 7:13 pm, by

AGM was retained by Tomar Realty Limited to develop a Plan of Subdivision in Coldstream. The proposed Poplar Woods Estates Subdivision is located on the south side of Ilderton Road just west of Bowling Green Drive. The draft plan has 10 estate lots and 1 open space block. As part of the draft plan submission  Continue Reading »

Devonshire Avenue Phase 2

Written on July 24, 2020 at 6:24 pm, by

The City of London awarded AGM Engineering the Design & Construction Administration for Contract #2 of the 2019-2020 Infrastructure Renewal Program (IRP).  Euclid Avenue and Birch Street was tendered in 2020 and is currently under construction.  The construction contract was awarded to J-AAR Excavating for the replacement of sanitary sewers, storm sewers, watermains and all  Continue Reading »

Egerton Street Phase 3 – 2020 Construction

Written on July 24, 2020 at 6:14 pm, by

Phase 3 of this project involves the reconstruction of Egerton Street from south of Ormsby Street to Cameron Street. Trafalgar Street to Egerton Street to Price Street, and Hamilton Road from Egerton Street to Hydro Street. Surface works include the full replacement of roadworks and sidewalks at Egerton, Trafalgar and Hamilton, including a full signal  Continue Reading »

Wickerson Hills Subdivision Phase 1

Written on October 24, 2016 at 4:59 pm, by

 

Bruce – Brighton Street

Written on April 1, 2016 at 5:48 pm, by

AGM was retained by the City of London to complete detailed design for the reconstruction of Bruce Street (Wharncliffe Road to Cathcart Street) and Brighton Street (Elmwood Avenue to Bruce Street) including Construction Administration Services.

Briscoe Street

Written on March 31, 2016 at 7:28 pm, by

AGM was retained by the City of London to complete detailed design for the reconstruction of Briscoe Street from Wharncliffe Road to Cathcart Street including Construction Administration Services.

Pioneer Energy

Written on April 14, 2013 at 8:51 pm, by

When AGM was awarded the project to expand the Pioneer Energy gas bar site, the task included overseeing the demolition of a residential house on the property. We also had to submit a grading report, implement storm drainage management, and because of old and new fuel storage tanks, had to ensure Environmentally Significant Area (ESA)/MOE  Continue Reading »